Dear SCREAns
All of you are aware that a Swabhiman-Samman Rally was conducted in New Delhi. Unfortunately the response from the Rail Mantralay is very poor and the ears of big bosses are deaf against the pleas of subordinate engineers. The reason may also be the feable voice of engineers. Every Rail Engineer should remember that the situation is NOW OR NEVER. Even at this juncture, if engineers do not raise their voice, they would not have any voice for the future. It is our dire need now to SHOUT so that the wax from the ears of Big Bosses should come out.
Even mother will never put in your plate unless you claim that you are hungry. Unfortunately, here there is not mother, but step mother is in place. You can imagine how hard is to get a loaf of bread. Our step brothers and sisters are getting HYDERABADI DUM BIRYANI and we are struggling hard to get even AMBALI. Even though DOPT gave circular to treat the engineers with GP4200 and above as Gazetted, Ministry of Rlys is not implementing the same and treating them as Technical Khalasis.
To get rid of these ambiguities, mass dharnas are planned infront of all Zonal Headquarters on 15th December 2011 and to submit memoranda to all General Managers for further transmission to Railway Ministry and administration. The Dharna is proposed from 10.00 hrs to 17.00 hrs., of 15.12.2011 and all Rail Engineers are requested to participate enmass to show our strength.
Be united..... Be frontlined.
Viswanadh
GS/SCREA
All of you are aware that a Swabhiman-Samman Rally was conducted in New Delhi. Unfortunately the response from the Rail Mantralay is very poor and the ears of big bosses are deaf against the pleas of subordinate engineers. The reason may also be the feable voice of engineers. Every Rail Engineer should remember that the situation is NOW OR NEVER. Even at this juncture, if engineers do not raise their voice, they would not have any voice for the future. It is our dire need now to SHOUT so that the wax from the ears of Big Bosses should come out.
Even mother will never put in your plate unless you claim that you are hungry. Unfortunately, here there is not mother, but step mother is in place. You can imagine how hard is to get a loaf of bread. Our step brothers and sisters are getting HYDERABADI DUM BIRYANI and we are struggling hard to get even AMBALI. Even though DOPT gave circular to treat the engineers with GP4200 and above as Gazetted, Ministry of Rlys is not implementing the same and treating them as Technical Khalasis.
To get rid of these ambiguities, mass dharnas are planned infront of all Zonal Headquarters on 15th December 2011 and to submit memoranda to all General Managers for further transmission to Railway Ministry and administration. The Dharna is proposed from 10.00 hrs to 17.00 hrs., of 15.12.2011 and all Rail Engineers are requested to participate enmass to show our strength.
Be united..... Be frontlined.
Viswanadh
GS/SCREA
No comments:
Post a Comment