Search This Blog

Monday, November 28, 2011

Temporary body for Hyderabad Division

Dear SCREAns
on 27-11-2011, subordinate engineers of Hyderabad division have gathered to elect division office bearers of Hyderabad Division. Due to unscheduled line blocks and due to inordinate delay in train services, only few engineers could able to attend the meeting. Around 20 engineers have attended the meeting conducted in the premises of the office of SSE/P.Way/KCG.  Burning problems of engineers and discrimination was discussed in the meeting and the need for unity among the engineers was highlighted.
A temporary division body was proposed by the gathered engineers till such time the General Elections were conducted and to gear up for the Dharna on 15th December. Er.B.G.K.Murthy, SSE/P.Way/KCG was proposed and unanimously kept as Advisor for the Division body. The following engineers were proposed and supported as the office bearers of HYB division.
  1. Er.B.G.K.Murthy          SSE/P.Way/KCG           Advisor                           9701372252
  2. Er.S.Amarendar              JE/Sig/MBNR              President                          9701372834
  3. Er. V. Prakash               SSE/Br/HYB               Vice President (Engg)          9701372250
  4. Er.Thomas                     SSE/Sig/MJF               Vice President (S&T)          9701372813
  5. Er.G.Sridhar                  SSE/Ele/M/NZB          Vice President (Elec)           9701372324
  6. Er. Vinod                      SSE/C&W/KCG          Divisional Secretary            9701372444
  7. Er.Praveen Kumar        SSE/PW/JCL                Addl.Divn.Secy(Engg)        9701372287
  8. Er.AMVL Narasimha Rao    JE/Tele/KCG        Addl.Divn,Secy (S&T)        9701372823
  9. Er. Premkumar               SSE/Ele/M/KCG         Addl.Divn.Secy (Elec)        9701372326
  10. Er.K.Srinivasa Raju        SSE/PW/BMO            Finance Secretary               9701372271
  11. Er. Pratap                        JE/TrD/KCG             Auditor                               9701372315
  12. Er. Ajay Gopal               SSE/TM/BMO            Exe.Committee Member     9701372256
  13. Er. Srinivas                     JE/P.Way/BSX           Exe.Committee Member   09730471266
  14. Er. P.Reraju                   SSE/TL/KCG              Exe.Committee Member     9701372316
One post of vice President (Mech) and Addl.Divn.Secy (Mech) are yet to be filled up. As the mechanical engineers were busily engaged in train certification duties, they could not attend the meeting and through phone they have communicated their support.
All the office bearers pledged that they shall dedicate their energies in making the organization strong and fight for the genuine cause.
Er.A.Kannan presided over the meet in presence of Er.K.Chandrasekhara Rao, Addl.Genl.Secretary and Er.Viswanadh, General Secretary.

--Viswanadh
GS/SCREA
                 

Thursday, November 24, 2011

Dear SCREAns
All of you are aware that a Swabhiman-Samman Rally was conducted in New Delhi. Unfortunately the response from the Rail Mantralay is very poor and the ears of big bosses are deaf against the pleas of subordinate engineers. The reason may also be the feable voice of engineers. Every Rail Engineer should remember that the situation is NOW OR NEVER. Even at this juncture, if engineers do not raise their voice, they would not have any voice for the future. It is our dire need now to SHOUT so that the wax from the ears of Big Bosses should come out. 

Even mother will never put in your plate unless you claim that you are hungry. Unfortunately, here there is not mother, but step mother is in place. You can imagine how hard is to get a loaf of bread. Our step brothers and sisters are getting HYDERABADI DUM BIRYANI and we are struggling hard to get even AMBALI. Even though DOPT gave circular to treat the engineers with GP4200 and above as Gazetted, Ministry of Rlys is not implementing the same and treating them as Technical Khalasis.

To get rid of these ambiguities, mass dharnas are planned infront of all Zonal Headquarters on 15th December 2011 and to submit memoranda to all General Managers for further transmission to Railway Ministry and administration. The Dharna is proposed from 10.00 hrs to 17.00 hrs., of 15.12.2011 and all Rail Engineers are requested to participate enmass to show our strength.


Be united..... Be frontlined.


Viswanadh
GS/SCREA

Wednesday, November 23, 2011

Division Elections of GTL division

Dear Engineers
All of you are aware that meeting was proposed and conducted in GTL on 06-11-2011. The meeting was conducted as scheduled and aroung 80 engineers from all the four departments have attended. Er.D.V.Subrahmanyam, Sr.DEN/Co-ord/GTL has attended the function as chief guest and addressed the gathered engineers. Er.A.Kannan highlighted the formation of SCREA and affiliation to AIREF. Er.Viswanadham explained the gathered engineers about the formation of SCREA, injustice done to cadre of Subordinate engineers in Railway, need for formation of Division level chapters of SCREA and the unity among the engineers. Volunteers are invited to act as office bearers for the Guntakal division till such time full pledged elections are conducted. Er.Hussaini, SSE/Drg was nominated as Divisional Secretary, Er.J.Srinivasulu, SFC/C&W as Vice President, Er.Ravi Babu, JE/P.Way as Vice President,  Er.J.Sudhakar, SSE/C&W as Auditor, Er.Muthuvaratha Raj, SSE/PWay and Er.Anbanandam, SSE/Works as Advisors, Er.Krishna Murthy, JE/Sig as Vice President, Er.R.Thirumala Rao, SSE/TM as Addl.Secy, and Er.Rajamani, SSE/EDPM are nominated as Office Bearers. All the members have promised that the need of the unity among engineers will be ensured.

--Viswanadh
GS/SCREA

Thursday, November 3, 2011

Engineers' meet at Guntakal

Dear SCREANs

It is proposed to conduct a meeting of South Central Railway Engineers' Association at Engineering Training Centre, near Diesel Training Centre, Guntakal on 06.11.2011 from 10.00 hrs., to 13.00 hrs. The issues pertaining to status of pay, workload, injustice made during paycommissions etc., to Subordinate Engineers of Railway are being discussed during the meeting. All Subordinate Engineers' of Guntakal division are requested to motivate and mobilize Rail Engineers enmass to the meeting. It is requested all Rail Engineers' to share their opinions on the injustice made during Pay Commissions and in the promotions.

It is also proposed to formulate the Guntakal Division Committee of SCREA. Rail Engineers' from Engineering, Mechanical, S&T  and Electrical branches are requested to nominate their representatives to the Division Committee. Nomination forms duly signed by candidate and First and Second supporters may be submitted to Er.A.Kannan, President/SCREA or Er.Viswanadh, GS/SCREA.

"Come.....Let us strengthen ourselves and fight for our own cause. Unless we rise our voice, we can achieve nothing and ultimately we will be thumped down."

GS/SCREA